Our Seamless Process

From first call to clean power, we keep it simple, transparent, and on schedule.

Step-by-Step

  1. Discovery call: goals, usage profile, and site basics.
  2. Site assessment: roof condition, shading, switchboard, and safety.
  3. Proposal & finance: options, yields, payback, and financing pathways.
  4. Engineering: detailed design, structural checks, and protection settings.
  5. Installation: safe, tidy works with minimal disruption.
  6. Commissioning: testing, grid sync, and documentation handover.
  7. Monitoring & support: ongoing optimisation and assistance.

Typical timeframes: residential 2–4 weeks from approval; commercial 4–10 weeks depending on size and approvals.

Permits, Rebates, and Grid Connection

We manage the paperwork end‑to‑end, including electrical safety, distributor approvals, and compliance with AS/NZS standards. Our team guides you through available state and federal incentives and ensures a smooth grid connection.

Financing Made Easy

  • Outright purchase: best lifetime value and strongest ROI
  • Green loans: spread costs with competitive rates
  • PPA: pay for energy produced with no upfront capex
  • Lease: predictable monthly cost with performance guarantees

Installation Experiences

“Crew arrived on time, kept the site spotless, and explained the monitoring app clearly.”

Daniela F., Essendon VIC

“Our warehouse install finished a day early, with zero interruption to operations.”

Chris O., Tullamarine VIC

Average customer rating: 4.9/5 for installation quality and communication.

Ready to Begin?

Speak with an engineer about your site. We’ll outline the best path to fast, reliable savings.

Book a Site Visit